{"id":5591,"date":"2023-01-24T10:02:06","date_gmt":"2023-01-24T10:02:06","guid":{"rendered":"https:\/\/www.rekadaya.co.id\/?p=5591"},"modified":"2023-03-31T03:30:07","modified_gmt":"2023-03-31T03:30:07","slug":"project-trasmission-line-70-kv-gi-namrole-namlea","status":"publish","type":"post","link":"https:\/\/www.plnnpc.com\/?p=5591","title":{"rendered":"Project Trasmission Line 70 kV GI Namrole-Namlea"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"5591\" class=\"elementor elementor-5591\" data-elementor-settings=\"{&quot;ha_cmc_init_switcher&quot;:&quot;no&quot;}\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-27ca924 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"27ca924\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;_ha_eqh_enable&quot;:false}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-055790b\" data-id=\"055790b\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-cf208e2 elementor-widget elementor-widget-text-editor\" data-id=\"cf208e2\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p class=\"MsoNormal\"><span lang=\"EN-ID\" style=\"font-size:14.0pt;line-height:115%\">Still\naround Eastern Indonesia, this time we will visit South Buru Island-Maluku, the\nlocation of one of the transmission line projects being worked on by PT\nRekadaya Elektrika (RE). The 70 kV Namrole \u2013 Namlea Transmission Line project\nwill connect two substations (GI), namely Namrole GI and Namlea GI, which cross\n7 villages with a total distance of 90.3 kilometers.<o:p><\/o:p><\/span><\/p><p class=\"MsoNormal\"><span lang=\"EN-ID\" style=\"font-size:14.0pt;line-height:115%\">Entering\nthe end of January, the overall progress of the work has reached 84.12%\n(leading from the target of 80.77%). Currently, the total land that has been\nacquired has reached 93.16%, with a total of 216 foundations that have been\ncompleted, of the target of 234 tower foundations (92.31%). (72.65%).<o:p><\/o:p><\/span><\/p><p class=\"MsoNormal\"><span lang=\"EN-ID\" style=\"font-size:14.0pt;line-height:115%\">The\nNamrole-Namlea 70 kV TL Project is also not free from a number of technical and\nnon-technical challenges. One of the obstacles faced was the rocky location of\nthe land, which made it difficult for the field team to work. However, the team\nin the field has exerted maximum effort, including using jack hammers and heavy\nequipment (excavators) to level the roads and the foundation construction\nsites.<o:p><\/o:p><\/span><\/p><p>\n\n\n\n\n\n<\/p><p class=\"MsoNormal\"><span lang=\"EN-ID\" style=\"font-size:14.0pt;line-height:115%\">The\nRE project team continues to make progress in the construction of this\ntransmission line, so that it can immediately meet the electricity needs of the\npeople on South Buru Island, Maluku.<o:p><\/o:p><\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Still around Eastern Indonesia, this time we will visit South Buru Island-Maluku, the location of one of the transmission line projects being worked on by PT Rekadaya Elektrika (RE). The 70 kV Namrole \u2013 Namlea Transmission Line project will connect two substations (GI), namely Namrole GI and Namlea GI, which cross 7 villages with a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5592,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[68],"tags":[],"class_list":["post-5591","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-npc-insite"],"_links":{"self":[{"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/posts\/5591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5591"}],"version-history":[{"count":7,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/posts\/5591\/revisions"}],"predecessor-version":[{"id":5684,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/posts\/5591\/revisions\/5684"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=\/wp\/v2\/media\/5592"}],"wp:attachment":[{"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5591"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.plnnpc.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}